As an outdoor aquatic facility, the George Bolton Aquatic centre required the expert knowledge of the FMG aquatic team to ensure the successful renovation of the pool and associated infrastructure. FMG provided civil, structural and aquatic engineering for the renovation work and the new plant room. The facility includes a 50m pool, learn to swim pool and a splash pad.