FMG Engineering joins forces with Newport Consulting Engineers to enhance our capabilities and expand our National footprint!
 Haigh's Chocolate Factory
Haigh's Chocolate Factory
Haigh’s Chocolates

Haigh’s set FMG Engineering’s Structural team the task of designing and documenting the factory’s 1,400 m2 concrete floor, without joints and to be completed in a single pour.

Steel Fibre Concrete

A challenge achieved using Dramix steel fibre concrete reinforcement, in combination with conventional reinforcing mesh.

Haigh’s will not only never have to worry about maintaining joints in their floor but also the smooth finish facilitates easy cleaning throughout the factory, decreasing cleaning time and increasing chocolate production and serviceability.

Structural Design

FMG, with assistance from Kohler Drafting Services, also carried out the structural design of the steel towers, silo platforms and pipe racking, undertook minor strengthening of the existing building structure and coordinated shop drawings for the whole production line.

Site
Mile End, SA
Client
Haigh’s Chocolates
Value
>$15 m
Period
2018
Haighs Chocolate Factory
Haighs Chocolate Factory

Benefits

  • The low maintenance specialised concrete flooring provides a smooth finish with no joints for easy cleaning
  • FMG’s early engagement with the project increased their understanding of the site and provided a trouble-free process for the client during the project’s life-cycle.
“The smooth finish facilitates easy cleaning throughout the factory, decreasing cleaning time and increasing chocolate production and serviceability”
Haighs Chocolate Factory
Haighs Chocolate Factory
Ready to start your next
engineering project?
Get In Touch
© 2024 FMG Engineering. All rights reserved.
Privacy Policy