Engaged by the SAJC, FMG designed and superintended the reconstruction of the racetrack “course proper“ at the Morphettville Racecourse. The success of the project was dependent on the construction of the wetlands at the same time as the track reconstruction.
FMG took the lead role in coordinating the wetland construction alongside the track reconstruction to ensure all parties’ best outcomes were achieved. FMG Engineering also project managed the Aquifer Storage and Recharge (ASR) construction and installation at the site with Australian Groundwater Technologies.